yeah but that's over 7 days. he was doing the math for only 5 days and loss of the first 4. Over 7 days starting from scratch he would get 04.04: 150. 05.04: 200. 06.04: 250. 07:04: 300. 08.04: 300. 09.04: 300. 10.04: 300.
Total 1800 saturday to friday (7 days). Not the 1000 he calculated.
its not 2100 but I'm trying to show him its not so bad.